Plan your whole plant on a single screen.
The Control Tower brings together the production orders on your lines and the dispatch orders on your dispatch units. Reschedule by dragging, move several orders at once and validate every change before saving it.
smart_toyBuilt to work with AI agentsSee how it worksarrow_downwardtouch_appTry it: drag a planned order to reschedule it.
Everything you need to reschedule with confidence.
Move
Drag an order in time. It snaps to the grid so it lands at the right hour.
Multi-select
Pick several orders and move them together, keeping the gaps between them.
Resize
Lengthen or shorten an order from either end.
Create from the timeline
Mark a range on a line and create a production, dispatch or planning order right there.
Conflict detection
If an order lands on top of another, you choose: push the neighbors to free space or keep the change.
Preview before saving
Before confirming you see how many orders are rearranged and between which dates. If the change isn't feasible, it can't be confirmed.
Live progress
Every order shows what has been produced in real time, straight from execution.
Live collaboration
If someone else changes the plan, the Control Tower tells you there is new data so you can refresh.
Every product knows where and how fast it is made.
The Control Tower and the planning agent work on the same foundation: what each product needs, which lines can make it and at what speed.
| Product | LineCrackers | LineAvena | LineChocolate | LineRellenas |
|---|---|---|---|---|
| 0.80 | block | block | 0.60 | |
| block | 0.70 | block | block | |
| block | block | 0.60 | 0.50 | |
| 0.90 | block | block | 1.20 |
- Format
- Case 24 × 180 g
- Routing
- Mixing → Baking → Packing
- Units per case
- 24
Per-product parameters
Format, manufacturing routing, units per case and everything each product needs to be made, in one place.
Speed per product and line
Each product has its own speed on each line. With it, the duration of every order is calculated automatically as you plan.
Enabled lines
You define which lines can make each product. The planning agent only proposes orders on those lines.
All under the ISA-95 standard. And if actual speed drifts from the configured one, Omniscient shows you, so the plan isn't optimistic.
From a sales order or a forecast, to a plan you can execute.
Sales orders
Each sales order becomes a planning order that asks for what has to be produced and shipped.
Demand forecasts
Plan from what you expect to sell too, not only from what you've already been asked for.
AI agents
An agent turns the customer's order into production and dispatch orders, ready to approve.
Meet the agentsarrow_forwardThe planning agent works on this very plan.
A sale comes in and the agent combines plant parameters with its rules, finds room in the Control Tower and proposes the production order. Once you approve it, it shows up in the plan.
Explore AI agentsarrow_forwardA sale comes in
- Customer
- Andes Distribution
- Product
- Orange juice 1 L
- Quantity
- 24,000 units
- Due
- Thursday 2:00 PM
The plan and reality, in the same view.
The MES sends every order's progress to the Control Tower. You see what has been produced, what is running and what comes next, with the now line marking the exact moment.
- checkReal progress per order, in tons or units
- checkAlerts on the orders that need attention
- checkResource monitor synced with the timeline
Planned on the real model of your plant.
- checkLines and dispatch units configured by the plant
- checkCapacities and parameters in the ISA-95 standard
- checkIntegration with your ERP
- checkRole-based permissions to decide who moves what
Want to see your plan in the Control Tower?
We'll show you what your plant would look like scheduled in Omniscient.
Book a demoarrow_forward