Automatic machine data capture
We connect your PLCs and sensors to record run time, stops and production counts, with no manual entry.
Measure Overall Equipment Effectiveness (OEE) straight from your machines, by line, shift and product. No spreadsheets, no waiting for month-end close.
Omniscient captures telemetry from your equipment, ties it to your production orders and shows availability, performance and quality by machine, by order and by day. No spreadsheets, no manual logging.
OEE (Overall Equipment Effectiveness) measures how much of your planned time was truly productive. It is the product of three factors:
Run time over planned time. Every stop brings it down.
Actual output compared with the nominal rate of each product or order.
Good units over total units produced.
Built alongside plant teams so the number reflects what really happens on the floor.
We connect your PLCs and sensors to record run time, stops and production counts, with no manual entry.
See minute by minute when each machine was running or stopped, and browse day by day.
Classify every stop with a catalog of reasons grouped by family. Use the platform's or create your own.
Assign run time to the right order so you know what was produced, when and on which machine.
Performance is measured against the ideal rate of each product or order, not a generic average.
Track live how far each production order is versus the planned quantity.
When information is missing to compute a KPI, the system says so and explains why, instead of showing a wrong number.
Equipment, orders and materials follow the ISA-95 standard, ready to integrate with your ERP.
We integrate your equipment via PLC, OPC-UA or MQTT and start receiving its telemetry.
We match that signal with your production orders, products and nominal rates.
Classify stops, spot losses and prioritize actions with real data.
The OEE module feeds Operational Intelligence. Every stop, every real speed and every unit produced becomes learning to plan your resources better and raise efficiency shift after shift.
Learns which variables affect your operation
Learns how fast each line actually runs with each product, and uses that to plan.
Identifies which variables are linked to stops and performance drops, so the plan accounts for them upfront.
The more data OEE captures, the more accurate your planning and the more efficient your plant.
See OEE for every machine and find where capacity is lost.
Follow each order's progress and assign time correctly.
Understand which stops repeat and how much time they cost.
Compare days, machines and orders with reliable KPIs.
Book a 30-minute session and we'll show you what Omniscient looks like connected to your equipment.
Talk to an expertarrow_forward